Milestone no.Milestone nameWP/Task no.Due date (M)Means of verification
MS1Kick-off meeting1.13Report
MS2Risk register update1.124Report
MS3Documentation management available1.23Report
MS4Health and safety survey completed 1.35Report
MS5Workshop with technology clusters1.436Report
MS6Communication strategy implementation2.118Report
MS7First CBI completed2.218Report
MS8Draft framework for sustainability LCA and DS4 seminar concept2.330Report
MS9Innovation Training Curriculum defined3.118Report
MS10Report from AIPF meetings and expert workshops3.224Report
MS11Topical mini workshops on particle therapy technologies3.318Indico page
MS12Technology validation workshop with focus on plasma/muon3.430Report
MS13Thin Film SRF workshop and lead roadmap discussion4.110Report
MS14Existing cryostat refurbished and commissioned for use with Nb3Sn cavities, coupler adaptation4.228Report
MS15Report on different types of 1.3 GHz cavity manufacturing and surface preparation4.322Report
MS16Test for development of small scale Nb3Sn targets4.424Report
MS171st deployment of novel SiC-based mirror in laser system5.136Measurement repetition
MS18First deployment of novel beam sampler in laser system5.236Measurement repetition
MS19Successful demonstration of autonomous tuning5.324Measurement repetition
MS20Realisation of the capillary5.428Prototype
MS21Realisation of dielectric structure5.528Prototype
MS22Cathode and anode produced6.125Measurement repetition
MS23Pulser V1 development completed6.215Measurement repetition
MS24FE-FRT V1 development completed6.220Measurement repetition
MS25Wide tape development6.336Measurement repetition
MS26Workshop on adjustable PM magnet technologies7.110Report
MS27Workshop on present and future magnet requirements7.219Report
MS28Specifications of the PMW7.312Report
MS29Magnetic design of the PMW7.324Report
MS30Report on HTS characterisation and quench studies8.218Report 
MS31Conceptual design of energy-saving split coils completed, construction started8.321Report
MS32HTS cable sample ready for testing8.424Report
MS33Design of the chirping cavity complete9.118Report
MS34Design of the transverse deflecting structure completed9.218Report
MS35Single- to multi- cell transfer & ALD-doped cavity tested10.136Report
MS36Cobot operational for HPR R&D in clean room10.224Report
MS37Specification of diagnostic performance requirements for cavities, vertical cavity tests, cryomodule validation10.430Report
MS38High-conductivity/temperature material characterisation11.130Report
MS39Vacuum and cooling proof-of-concept test completed11.136Report
MS40RFQ design completed11.220Report
MS41IH-DTL design completed11.320Report
MS42Collector manufactured11.434Report
MS43Production and characterization of 4 Cr-Gr functional prototype beam absorber blocks12.120Prototype