| Milestone no. | Milestone name | WP/Task no. | Due date (M) | Means of verification |
|---|---|---|---|---|
| MS1 | Kick-off meeting | 1.1 | 3 | Report |
| MS2 | Risk register update | 1.1 | 24 | Report |
| MS3 | Documentation management available | 1.2 | 3 | Report |
| MS4 | Health and safety survey completed | 1.3 | 5 | Report |
| MS5 | Workshop with technology clusters | 1.4 | 36 | Report |
| MS6 | Communication strategy implementation | 2.1 | 18 | Report |
| MS7 | First CBI completed | 2.2 | 18 | Report |
| MS8 | Draft framework for sustainability LCA and DS4 seminar concept | 2.3 | 30 | Report |
| MS9 | Innovation Training Curriculum defined | 3.1 | 18 | Report |
| MS10 | Report from AIPF meetings and expert workshops | 3.2 | 24 | Report |
| MS11 | Topical mini workshops on particle therapy technologies | 3.3 | 18 | Indico page |
| MS12 | Technology validation workshop with focus on plasma/muon | 3.4 | 30 | Report |
| MS13 | Thin Film SRF workshop and lead roadmap discussion | 4.1 | 10 | Report |
| MS14 | Existing cryostat refurbished and commissioned for use with Nb3Sn cavities, coupler adaptation | 4.2 | 28 | Report |
| MS15 | Report on different types of 1.3 GHz cavity manufacturing and surface preparation | 4.3 | 22 | Report |
| MS16 | Test for development of small scale Nb3Sn targets | 4.4 | 24 | Report |
| MS17 | 1st deployment of novel SiC-based mirror in laser system | 5.1 | 36 | Measurement repetition |
| MS18 | First deployment of novel beam sampler in laser system | 5.2 | 36 | Measurement repetition |
| MS19 | Successful demonstration of autonomous tuning | 5.3 | 24 | Measurement repetition |
| MS20 | Realisation of the capillary | 5.4 | 28 | Prototype |
| MS21 | Realisation of dielectric structure | 5.5 | 28 | Prototype |
| MS22 | Cathode and anode produced | 6.1 | 25 | Measurement repetition |
| MS23 | Pulser V1 development completed | 6.2 | 15 | Measurement repetition |
| MS24 | FE-FRT V1 development completed | 6.2 | 20 | Measurement repetition |
| MS25 | Wide tape development | 6.3 | 36 | Measurement repetition |
| MS26 | Workshop on adjustable PM magnet technologies | 7.1 | 10 | Report |
| MS27 | Workshop on present and future magnet requirements | 7.2 | 19 | Report |
| MS28 | Specifications of the PMW | 7.3 | 12 | Report |
| MS29 | Magnetic design of the PMW | 7.3 | 24 | Report |
| MS30 | Report on HTS characterisation and quench studies | 8.2 | 18 | Report |
| MS31 | Conceptual design of energy-saving split coils completed, construction started | 8.3 | 21 | Report |
| MS32 | HTS cable sample ready for testing | 8.4 | 24 | Report |
| MS33 | Design of the chirping cavity complete | 9.1 | 18 | Report |
| MS34 | Design of the transverse deflecting structure completed | 9.2 | 18 | Report |
| MS35 | Single- to multi- cell transfer & ALD-doped cavity tested | 10.1 | 36 | Report |
| MS36 | Cobot operational for HPR R&D in clean room | 10.2 | 24 | Report |
| MS37 | Specification of diagnostic performance requirements for cavities, vertical cavity tests, cryomodule validation | 10.4 | 30 | Report |
| MS38 | High-conductivity/temperature material characterisation | 11.1 | 30 | Report |
| MS39 | Vacuum and cooling proof-of-concept test completed | 11.1 | 36 | Report |
| MS40 | RFQ design completed | 11.2 | 20 | Report |
| MS41 | IH-DTL design completed | 11.3 | 20 | Report |
| MS42 | Collector manufactured | 11.4 | 34 | Report |
| MS43 | Production and characterization of 4 Cr-Gr functional prototype beam absorber blocks | 12.1 | 20 | Prototype |
| MS44 | Identification of alloy systems and manufacturing of first RHEA prototypes using AM and FAST/SPS | 12.2 | 26 | Report |