Deliverable N#Deliverable nameShort descriptionWP/Task n.Lead Part.TypeDissem. levelDelivery (M)
D1.1ICPInternal Communication Plan1.1CERNRSEN4
D1.2DPDissemination Plan1.2PoliMiRSEN6
D1.3E & IPExploitation & Impact generation Plan1.2PoliMiRPU12
D1.4DMPData Management Plan1.3CERNDMPPU6
D1.5EDPEthics & Diversity Plan1.4GSIETHPU7
D1.6Roadmap reportIdentification of global roadmap of accelerator technology needs2.1CIEMATRPU24
D2.1Communication PlanCommunication strategy and outreach implementation plan2.1UOXFRPU9
D2.2CBI Delivery reportReport on the delivery of the 2 CBI programme2.2CNRSRPU30
D2.3Sustainability reportReport on early-stage sustainable design concepts and impact assessment2.3DESYRPU46
D3.1Knowledge TransferInnovation inventory and report on mentorship programme3.1ULIVRPU42
D3.2Industry Recommend.White Paper on risk-sharing models and innovation procurement3.2CERNRPU37
D3.3Application RoadmapStrategic roadmap for societal applications of accelerator technologies3.3RTURPU42
D3.4Future Acc.Report on future accelerator concepts3.4GSI / CERNRPU46
D4.1IndustrialisationReport on industrialisation perspective and recommendations4.1UKRIRPU42
D4.2Test StandsHorizontal RF test of conduction cooled 1.3 GHz cavity with off-axis couplers4.2HZBDEM/RPU46
D4.3CavitiesReport on Nb3Sn coated 1.3-GHz cavity with coupler ports4.3INFNDEM/RPU40
D4.4TargetsProduction and tests of Nb3Sn cylindrical sputtering targets4.4CEADEM/RPU36
D5.1Coated mirrorDevelopment progress and stabilisation performance of lightweight SiC mirrors with stress-compensating coating5.1CNRSDEM/RPU40
D5.2Broad-band beam samplerDevelopment progress and performance achieved with beam samplers5.2CNRDEM/RPU46
D5.3Laser TunningImplementation of machine learning techniques and performance achieved5.3DESYRPU33
D5.4Plasma BendingRealisation of curved capillary prototype of plasma-based beam bending5.4INFNDEM/RPU42
D5.5Dielectric structureReport on realisation of co-propagating dielectric structure5.5INFNDEM/RPU42
D6.1Magnetron Development progress and performance achieved by magnetron prototype tests6.1HZBDEM/RPU37
D6.2FE-FRT and HV pulserDevelopment progress and performance achieved by FE-FRT and High-Voltage Pulser prototypes6.2HZBDEM/RPU38
D6.3HTS tapeLarge width HTS tape characterised at low gradient6.3CERNDEM/RPU42
D7.1Modularisation methodologyReport on approach for modularisation of tuneable PM7.1UKRIRPU21
D7.2Modular ZEPTO-PROProof-of-principle ZEPTO-PRO prototype magnet7.2KYMADEM/PSEN42
D7.3Magnet fabricationFabrication of the PMW, including magnetic measurements7.3CIEMATDEM/RPU38
D8.1HiTAT workshopHiTAT workshop and identified priorities for HTS R&D coordination8.1CERNRPU32
D8.2HTS conductor Results of conductor testing, splice evaluation, quench protection studies8.2CIEMATDEM/RPU28
D8.3Solenoid coil qualifiedDesign, construction, and qualification of a 7 T solenoid coil at cryogenic temperature8.3INFNDEM/RSEN42
D8.4Fast-ramping HTS cable Performance results of fast-ramping HTS cable and splice tests8.4GSIDEM/RSEN40
D9.1Chirping cavityLow-power RF measurements of chirping cavity9.1INFNDEM/RPU30
D9.2Transverse Defl. StructureLow-power RF measurements of transverse deflecting structure9.2PSIDEM/RPU30
D10.1Heat treatments and furnace specificationsAppropriate treatments and materials analyses with heat treatment and coatings recipes transferable to industry10.1DESYRPU40
D10.2Cobotised HPR set-upHPR set-up with cobot fully operational and qualified10.2CNRSDEM/PPU30
D10.3Performance preserv., recoveryReport on preservation and recovery of cavity performance10.3INFNRPU44
D10.4Cavity prototypeHigh-Q high-G Cavity prototype fully qualified10.4CEADEM/PPU45
D11.1AM HandbookAdditive manufacturing comprehensive technical handbook11.1INFNRPU46
D11.2RFQRFQ design and manufacturing report11.2PoliMiDEM/RPU35
D11.3IH-DTLIH-DTL design and manufacturing report11.3GUFDEM/RPU32
D11.4Collector Report on qualification of collector in demonstrator11.4GSIRPU46
D12.1Cr-Gr prototypesManufacturing, characterisation, and irradiation of Cr-Gr samples12.1CERNDEM/RPU32
D12.2RHEA prototypes Manufacturing, irradiation, and characterisation of RHEA prototypes12.2GSIDEM/RPU42

Milestone N#Milestone nameRelated WP/TaskDue date (M)Means of verification
MS1.1Kick-off meeting1.13Report
MS1.2Risk register update1.124Report
MS1.3Documentation management available1.23Report
MS1.4Health and safety survey completed 1.35Report
MS1.5Workshop with technology clusters1.436Report
MS2.1Communication strategy implementation2.118Report
MS2.2First CBI completed2.218Report
MS2.3Draft framework for sustainability LCA and DS4 seminar concept2.330Report
MS3.1Innovation Training Curriculum defined3.118Report
MS3.2Report from AIPF meetings and expert workshops3.224Report
MS3.3Topical mini workshops on particle therapy technologies3.318Indico page
MS3.4Technology validation workshop with focus on plasma/muon3.430Report
MS4.1Thin Film SRF workshop and lead roadmap discussion4.110Report
MS4.2Existing cryostat refurbished and commissioned for use with Nb3Sn cavities, coupler adaptation4.228Report
MS4.3Report on different types of 1.3 GHz cavity manufacturing and surface preparation4.322Report
MS4.4Test for development of small scale Nb3Sn targets4.424Report
MS5.11st deployment of novel SiC-based mirror in laser system5.136Measurement rep.
MS5.2First deployment of novel beam sampler in laser system5.236Measurement rep.
MS5.3Successful demonstration of autonomous tuning5.324Measurement rep.
MS5.4Realisation of the capillary5.428Prototype
MS5.5Realisation of dielectric structure5.528Prototype
MS6.1Cathode and anode produced6.125Measurement rep.
MS6.2Pulser V1 development completed6.215Measurement rep.
MS6.3FE-FRT V1 development completed6.220Measurement rep.
MS6.4Wide tape development6.336Measurement rep.
MS7.1Workshop on adjustable PM magnet technologies7.110Report
MS7.2Workshop on present and future magnet requirements7.219Report
MS7.3Specifications of the PMW7.312Report
MS7.4Magnetic design of the PMW7.324Report
MS8.1Report on HTS characterisation and quench studies8.218Report 
MS8.2Conceptual design of energy-saving split coils completed, construction started8.321Report
MS8.3HTS cable sample ready for testing8.424Report
MS9.1Design of the chirping cavity complete9.118Report
MS9.2Design of the transverse deflecting structure completed9.218Report
MS10.1Single- to multi- cell transfer & ALD-doped cavity tested10.136Report
MS10.2Cobot operational for HPR R&D in clean room10.224Report
MS10.3Specification of diagnostic performance requirements for cavities, vertical cavity tests, cryomodule validation10.430Report
MS11.1High-conductivity/temperature material characterisation11.130Report
MS11.2Vacuum and cooling proof-of-concept test completed11.136Report
MS11.3RFQ design completed11.220Report
MS11.4IH-DTL design completed11.320Report
MS11.5Collector manufactured11.434Report
MS12.1Production and characterization of 4 Cr-Gr functional prototype beam absorber blocks12.120Prototype
MS12.2Identification of alloy systems and manufacturing of first RHEA prototypes using AM and FAST/SPS12.226Report